FEI Engineers

Water & Wastewater Expertise

FEI Engineers has significant experience with water and wastewater treatment, transmission, distribution and storage, lift/pump stations, process equipment and technology, biosolids, plant hydraulics, plant optimization, and facility evaluations.

Services
  • Home

Water Treatment Facilities     |     Water Storage     |     Distribution     |     Hydraulics

Our Team has extensive experience with planning, designing, and constructing water treatment facilities using state-of-the-practice processes and equipment.  FEI Engineers is experienced with water treatment technologies such as membrane filtration systems, disinfection bi-product control, and radionuclide removal systems. 
Sample water projects have included but are not limited to:
  • Soldier Canyon Filter Plant Expansion Feasibility Study (60 MGD)
  • Town of Bayfield Water Treatment Plant Expansion
  • Town of Estes Park Water Master Plan
  • Pine Brook Water District Hydraulic Model
  • Gateway Village Pump Station & Water Storage Tank
  • Pagosa Area Water & Sanitation District Hatcher Water Treatment Plant Improvements (4 MGD)
  • City of Raton Water Treatment Plant Expansion
  • Mesa Verde National Park Waterline Replacement
  • Henderson Mill Water Treatment Plant Improvements
  • Town of Frisco Water Distribution System Improvements

Wastewater Treatment Facilities     |     Collection & Conveyance     |      Biosolids Processing

FEI Engineers has extensive experience with planning, designing, and constructing wastewater treatment facilities using state-of-the-practice processes and equipment. Our professional team has experience with the design of biological nutrient removal systems using advanced activated sludge processes, oxidation ditches, membrane bioreactors, sequencing batch reactors, and integrated fixed-film activated-sludge processes; as well as tertiary treatment for metals and phosphorus removal.
Sample wastewater projects have included but are not limited to:
  • St. Vrain Sanitation District Wastewater Treatment Plant Expansion (6 MGD)
  • City of Boulder IBM Lift Station (2.8 MGD)
  • Town of Erie Water Reclamation Facility Optimization Study
  • Town of Nederland Lagoon Upgrades to a Mechanical WWTF
  • Eagle River Water & Sanitation District Avon WWTF Blower Upgrades (4.3 MGD Energy Efficiency Improvements)
  • Village of Taos Ski Valley WWTF Upgrades and SCADA Improvements
  • Town of Georgetown Biosolids Dewatering
  • City & County of Denver Stapleton Lift Station (3.5 MGD)